Suratgarh

At this project 2 units of 2MW each have been installed and the power house is in operation since feb 1992.
SALIENT FEATURES
1. Installed Capacity 2 x 2.0 MW
2. Location of Power House Near off take point of Suratgarh branch canal of Indira Gandhi Main Canal.
3. Nearest Village Lakhuwali District Sriganganagar
4. Nearest Rly. Station Hanumantgarh(36 KM)
5. Suppliers & erector of main generating equipments M/s B.H.E.L
6. Civil Contractors of PH Building M/s Raj. Construction Co.,Panchkula(Haryana)
7. Consultantst CEA for electrical works&WAPCOS for civil works
8. Designed Discharge 57.8 cumecs
9. Designed head 8.48 MT
10. Steel consumption 950 MT
11. Cement construction 4150 MT
12. Commissioning month Feb.'92
13. Planned annual generation 176.4 lacs units.
14. Cost and Expenditure on scheme  
  Approved Cost(Aug.'84) 526.57 lac
Revised Cost(89-90) 1095.68 lac
latest Cost estimate 1358.42
Expenditure upto 31.3.93 975.69 lac
^TOP