Ramgarh Gas Thermal Power Station

• Ramgarh gas thermal power station is the first gas thermal power plant of Rajaisthan.(On dated 13-11-1994)

LOCATION

Ramgarh gas thermal power plant station is situated near village Ramgarh and 60 kms away from Jaisalmer. It is the installed capacity of 113.5 MW.

Stage
Unit No.
Capacity (MW)
Cost (Rs. Crore)
Synchronising Date
I
*1(Gas Turbine)
3MW*
19
13.11.1994
I
1(Gas Turbine)
35.5
180
12.1.1996
II
2(Gas Turbine)
37.5
300
7.08.2002
 
3(Steam Turbine)
37.5
25.04.2003
*No generation due to shortage of adequate gas availabltity
Operational Performance of Plant
Particulars
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
Gross Generation (LU)
4356.209
4041.440
4141.153
3486.782
3539.44
3028.85
Plant Load Factor (%)
45.00%
41.75%
42.78%
36.00%
36.57%
31.29%
Aux.Power Consumption (LU)
311.662
268.179
551.61
333.116
279.029
161.452
Gas Consumption(SCM)
238364647
240482508
248875773
209782021
213635298
183481825

EXPANSION

GAS THERMAL POWER STATION STAGE III

1.
Proposed capacity
160MW
2.
Location
Ramgarh
3.
Total plant area
796 bigha,17 biswa
4.
Project cost
640 crores
5.
Fuel
GAS and HSD
6.
Source of water
Indra Gandhi canal
7.
Fuel required
9.5 lac. SCM per day
8
Water allocation
10.8 cusecs

The Foundation stone of stage III was laid by honourable Chief Minister Sh. Ashok Gehlot on 14.05.2010

The gas and steam unit are schedule to be syncronised on respect Jan. 2012 & May 2012 respectively

At present a combined gas cycle power unit of 160MW under stage III is under construction.