CHHABRA THERMAL POWER PROJECT

Chhabra Thermal Power Project is located near village Chowki Motipura in Tehsil Chabbra, Distt. Baran (Rajasthan) which is 22 Km from Chabbra Town ,10 Km from inter state border of Madya Pradesh, 147 Km from Kota. Plant site is well connected to State Highway-51 & located on Bina-Kota line of West Central Railway.

STAGE-I (Phase 1 & 2 )

Unit #1 (250MW) and Unit#2 (250 MW) of this project constructed under Stage-I (Phase-I) started commercial operation w.e.f. 11.06.2010 and 15.10.2011 respectively. Further Unit#3 (250 MW) constructed under under stage-I (Phase-II) started commercial operation operation w.e.f. 19.12.2013. Unit# 4(250 MW) is Synchronized on oil on 23.04.14 and its Commercial operation is targetted for June 2014.

Project Highlights:

(1)
Installed Capacity
2X250 MW Stage- I, Phase- I
2X250 MW Stage- I, Phase- II
(2)
Estimated Cost
2820 Crores (Phase- I)
3033 Crores (Phase- II)
(3)
Land Acquired
526 Hectares (Stage-I)
(4)
Height of chimney
220 Meter each for Phase-I & II
(5)
ESP Efficiency
99.89%
(6)
Coal Requirement and Linkage
5.0 Million Tons per year
Unit-1&2- SECL, Kobra (C.G.) through washery circuit.
Unit-3&4- Parsa East & Kante Basen Coal Blocks through Parsa & Kante Colleries Ltd., Ambikapur (C.G.)
(7)
Water Requirement
800 MCFT/ Year (38500 M3/ day)(For Phase I&II from nearby Parvati, Bethali & Hinglot Dam.
(8)
Power Evacuation
400KV /220 kv Switchyard with Inter-connecting Transformers (ICT) through 400KV Bhilwara, 400KV Hindaun, 400KV Adani and 220 KV Jhalawar & 200 KV Kawai-Dahara feeders.
(9)
Date of COD
Phase -I & II
Unit #1- COD achieved on 11.06.2010
Unit #2- COD achieved on 15.10.2011
Unit #3- COD achieved on 19.12.2013
Unit #4- Synchronized on oil on 23.04.2014
(10)
Environmental Features
Zero discharge concept adopted

ETP & STP established. Re-cycled water utilization for green belt development.

100% (Approx.) Fly Ash Utilization by cement & near-by bricks industries.

OPERATIONAL PARAMETERS

Year
Gen(MU)
PLF(%)
SPCFC COAL CONSUMPTION
SPCFC OIL CONSUMPTION
AUX. CONSUMPTION
2010-2011
971.36
55.07
0.64
5.38
11.37
2011-2012
2260.96
70.50
0.66
3.15
11.60
2012-2013
2924.17
66.76
0.64
1.65
10.69
2013-2014
3158.449
63.22
0.66
2.54
10.63

SALIENT FEATURES OF 2X660 MW SUPERCRITICAL UNIT # 5 & 6 STAGE-II, PHASE-III

(1)
Location

At Chowki Motipura about 22 Km from Chabbra Town in Baran District of Rajasthan. The site lies between- North Latitudes 24 degree 24 inches and East Longitude 77 Degree 03 inches.

(2)
Nearest Railway Station
Motipura Chowki ( Between Beena- Kota Section)
(3)
Installed Capacity
2X660 MW Stage-II, Phase- III
(4)
Estimated Cost
7920 Crores Rs.
(5)
Land Acquired
2361 Bigha (597.43 Hec.)
(6)
Height of Chimney
275 Meter (Twin Flue)
(7)
ESP Efficiency
99.89%
(8)
Fuel Requirement
Coa l- 6.5 MTPA

Unit # 5 - Parsa East & Kante Basan Coal Block

Unit # 6 - Kante Basan Extension Coal Block.
HSD/FO - 11563 KL/Year (for both units)
(9)
Water Requirement
1570 MCFT/ YEAR
Lhasi Irrigation Project- 300MCFT
Parvan Irrigation Project- 1270 MCFT
(10)
Scheduled Date of Commissioning
Unit#5 - September 2016
Unit#6 - December 2016

Chhabra Supercritical  TPP Unit - 5 & 6 (2x660 MW)

S. No.

ACTIVITIES

Schedule Date

Actual Date

Unit # 5  660 MW

Unit # 6 660 MW

Unit # 5  (660 MW)

Unit # 6  (660 MW)

1

2

3

4

1

Administrative & financial approval from GOR

02.03.09

02.03.09

2

Land Acquisition

 

  Award of land finalized by GoR. Aquisition of Land completed.

3

Water Allocation

30.06.09

Total 1570 MCFT Water allocated by WRD  vide letter dated 22.11.10 in which  1270 MCFT allocated from Parwan Major irrigation project and 300  MCFT water allocated from Lashi  Irrigation project vide letter dated 11.08.2009 .

4

Availability of Water

30.09.12

 

5

Tie-up for coal block

30.09.09

Parsa East & Kante Basan  coal blocks  shall  meet part requirement of coal for both the units of supercritical power projects and balance requirement of Coal shall be met from Kente extention Coal block allocated by Ministry of Coal on dated 05.08.13.

6

MoEF Clearance

 

Environmental clerance (EC) for unit-5 granted by MoEF, New Delhi vide letter dated 23.05.2012 and EC for unit-6 shall be granted after ensuring the fuel availability.

7

Date of award of EPC

 

          LOI placed to M/s L&T on 28.03.13

8

Date of Commissioning

 

Unit # 5  (660 MW)     Sept'16

Unit # 6  (660 MW)                                  June'18

GAS BASED UNITS (PROPOSED)

(1)
Proposed Capicity
3x110 MW
(2)
Location
Near village Chowki Motipura, Tehsil Chhabra, Baran District
(3)
TOTAL PLANT AREA
67 Acres
(4)
PROJECT COST
RS. 1320 CRORES
(5)
FUEL
PRIMARY FUEL: Liquefied Natural Gas
(6)
FUEL REQUIREMENT
1.70 MMSCMD
(7)
SOURCE OF WATER Parwan DAM
(8)
WATER ALLOCATION 10 CUSEC (315 mcft)
(9)
STACK 70 Meter
(10)
NEAREST RAILWAY STATION
CHOWKI MOTIPURA
^TOP